|
Architectural
 |
Site
Development
|
 |
Master
Planning
|
 |
General
Architectural Design
|
 |
Codes
Compliance Assessment
|
 |
cGMP
Compliance Assessment
|
|
 |
|
Civil/Structural Engineering
 |
Master
Planning
|
 |
Bldg.
Structural Assessment
|
 |
Structure
Design
|
 |
Site
Development
|
 |
Grading and
Sewer Design
|
 |
CES Plans
|
|


 |
|
HVAC
Engineering
 |
Aseptic
Areas
|
 |
GMP areas
|
 |
Clean Rooms
|
 |
HVAC
Assessments
|
 |
Dust
Collection
|
 |
Fume
Collection
|
 |
Coating (Accellacota)
|
 |
FBD (Glatts)
|
 |
Low Humidity
Rooms
|
 |
BAS-DDC-PLC
Controls and Integration
|
 |
Cool & Cold
Rooms
|
 |
Weighing
Areas
|
 |
Laminar
Booths
|
 |
VAV and CAV
systems
|
 |
Laboratories
|
 |
Pressurization and Air Flow Controls/Schemes
|
 |
Energy
Recovery
|
|



|
Mechanical Engineering
 |
Chilled and
Cooling Water
|
 |
Steam and
Condensate
|
 |
Compress Air
(Oil Free)
|
 |
Soft , Cold
and Hot Water
|
 |
High Vacuum
|
 |
Janitorial
Vacuum
|
 |
Breathing
Air
|
 |
Process RHW
|
 |
Purified
Water Systems
|
 |
Process
Sewer
|
 |
Sanitary and
Storm Sewer
|
 |
Lift
Stations
|
 |
Process
Piping
|
 |
Spill
Containment
|
 |
Transfer
Station
|
 |
Fire
Protection
|
 |
Energy
Recovery
|
|

 |
|
Fire
Protection Engineering
 |
Assessments
|
 |
Pumping
Systems
|
 |
Storage
Tanks
|
 |
Site FP & Distribution
 |
Foam – Water
Systems
|
 |
Water Deluge
|
 |
Wet Design
|
|
 |
Sprinkler
Design
 |
Haz. Class-NFPA
13
|
 |
In-rack
|
 |
ESFR
|
 |
Pre-action
|
 |
Clean Agents
(FM200)
|
 |
Flooded
Systems (CO2)
|
|
|
|
|
Electrical Engineering
 |
Facility
Assessments
|
 |
Power Factor
Upgrading
|
 |
Emergency
Generation
|
 |
Substation
Design
|
 |
Communication Systems
|
 |
Smoke
Detection and Fire Alarm
|
 |
Instrumentation
|
 |
PLC Controls
|
 |
Lighting and
Power
|
|

|