Architectural
|
Site
Development
|
|
Master
Planning
|
|
General
Architectural Design
|
|
Codes
Compliance Assessment
|
|
cGMP
Compliance Assessment
|
|
|
Civil/Structural Engineering
|
Master
Planning
|
|
Bldg.
Structural Assessment
|
|
Structure
Design
|
|
Site
Development
|
|
Grading and
Sewer Design
|
|
CES Plans
|
|
|
HVAC
Engineering
|
Aseptic
Areas
|
|
GMP areas
|
|
Clean Rooms
|
|
HVAC
Assessments
|
|
Dust
Collection
|
|
Fume
Collection
|
|
Coating (Accellacota)
|
|
FBD (Glatts)
|
|
Low Humidity
Rooms
|
|
BAS-DDC-PLC
Controls and Integration
|
|
Cool & Cold
Rooms
|
|
Weighing
Areas
|
|
Laminar
Booths
|
|
VAV and CAV
systems
|
|
Laboratories
|
|
Pressurization and Air Flow Controls/Schemes
|
|
Energy
Recovery
|
|
|
Mechanical Engineering
|
Chilled and
Cooling Water
|
|
Steam and
Condensate
|
|
Compress Air
(Oil Free)
|
|
Soft , Cold
and Hot Water
|
|
High Vacuum
|
|
Janitorial
Vacuum
|
|
Breathing
Air
|
|
Process RHW
|
|
Purified
Water Systems
|
|
Process
Sewer
|
|
Sanitary and
Storm Sewer
|
|
Lift
Stations
|
|
Process
Piping
|
|
Spill
Containment
|
|
Transfer
Station
|
|
Fire
Protection
|
|
Energy
Recovery
|
|
|
Fire
Protection Engineering
|
Assessments
|
|
Pumping
Systems
|
|
Storage
Tanks
|
|
Site FP & Distribution
|
Foam – Water
Systems
|
|
Water Deluge
|
|
Wet Design
|
|
|
Sprinkler
Design
|
Haz. Class-NFPA
13
|
|
In-rack
|
|
ESFR
|
|
Pre-action
|
|
Clean Agents
(FM200)
|
|
Flooded
Systems (CO2)
|
|
|
|
Electrical Engineering
|
Facility
Assessments
|
|
Power Factor
Upgrading
|
|
Emergency
Generation
|
|
Substation
Design
|
|
Communication Systems
|
|
Smoke
Detection and Fire Alarm
|
|
Instrumentation
|
|
PLC Controls
|
|
Lighting and
Power
|
|
|